The New Year is the perfect moment to reset the one thing that quietly shapes safety culture more than posters, slogans, or toolbox talks:
Follow-through.
Every business starts the year with good intentions—closing hazards, completing audit actions, and preventing repeat incidents. But once the year gets busy, action lists can grow quickly, and it becomes harder to keep everything clear, prioritised, and moving forward.
If you want 2026 to feel different, the goal isn’t “more actions.” It’s a system that makes actions clear, trackable, and verifiably closed—with accountability built in.
That’s exactly what myosh Action Management is designed to do: manage the full action lifecycle from creation to closure and verification, while staying connected to the records that triggered the action in the first place (incidents, hazards, inspections, audits, and more).
Why action backlogs happen (even in good teams)
Most action programs fail for predictable reasons:
A New Year reset is a chance to fix the system, not just chase the list.
What good looks like in 2026
A strong action management process has five qualities:
How myosh Action Management supports follow-through
myosh Action Management is built to reduce friction in task assignment and close-out by supporting the full lifecycle of actions—creation, assignment, prioritisation, progress tracking, collaboration, verification, and closure.
Here are the capabilities that matter most when you’re trying to start the year with momentum:
1) Create actions from anywhere (and keep the context)
Actions can be created manually or automatically generated from other modules (like Incidents or Inspections), then linked directly to source records for traceability.
This means you’re not “copying and pasting” tasks into a separate list—you’re building a connected improvement system.
2) Clear responsibility: “Accountable” vs “Assigned to”
In myosh, you can define who is Accountable for ensuring completion and who the action is Assigned to for carrying out the work.
This is a simple design choice that dramatically reduces “it’s not mine” confusion.
3) Due dates, priority, and a workflow that reflects reality
You can set mandatory due dates, priorities (e.g., Low/Medium/High/Critical), and track status changes through defined stages (e.g., Draft, Open, Overdue) with overdue status automatically applying when the due date passes.
4) Keep evidence on the action (not in someone’s inbox)
Assignees can add comments/updates and attach evidence like photos and documents directly to the action record. When the auditor asks “show me what was done,” you’re not chasing screenshots across phones.
5) Reminders and escalations that keep things moving
Automated email reminders for upcoming/overdue actions and escalation processes to notify supervisors or managers are specifically called out as part of the module’s workflow support.
This reduces manual follow-up and helps teams maintain momentum on high-priority tasks.
A simple New Year “Action Reset” plan (use this in January)
Here’s a practical 2026 reset you can run in a week.
Step 1: Clean up your action types (keep it simple)
Start with 3–5 action types your business understands. For example:
myosh supports configurable workflows and action types so the process reflects how you actually work.
Step 2: Standardise ownership rules
Define one rule and repeat it everywhere:
This mirrors the structure the Actions module supports.
Step 3: Re-prioritise the backlog using risk and time
Don’t treat all actions equally. Prioritise by:
The module supports priorities and due dates to drive this.
Step 4: Create “verification before close” as a non-negotiable
A common failure is closing actions because the box is ticked—not because the risk is reduced.
myosh supports verification steps before an action is formally closed to ensure effectiveness.
Step 5: Turn recurring problems into templates
If you have repeat tasks (monthly inspections, routine corrective actions), reduce admin by cloning actions rather than rebuilding them each time—something the Actions module explicitly supports (“Clone Action”).
Step 6: Make overdue visible (and automatic)
Overdue shouldn’t be a surprise—actions can automatically become Overdue when the due date passes while still Open. Combine that with reminders/escalations so overdue isn’t ignored.
The best New Year KPI isn’t “more actions completed”
Try these instead:
Because actions are linked to incidents, hazards, inspections and audits, you can keep the context and measure improvement where it matters.
Make 2026 the year actions actually close
If your organisation has a goal for 2026—fewer repeat incidents, better audit outcomes, stronger contractor compliance—your action system is the engine that gets you there.
myosh Action Management helps you:
With myosh, actions don’t just sit in a list—they’re visible on your dashboard, so teams can instantly see what’s due, what’s overdue, and what needs attention first. This keeps priorities clear and makes follow-through part of the daily rhythm, not a once-a-month clean-up.
Book a demo to see how Action Management connects to your incidents, inspections and audits.